GC: Parker Brown · GC: Burbank, CA
Precision chiller replacement and chilled water system for a LINAC radiation therapy suite — stringent temperature and humidity requirements in an operational healthcare environment.
Precision chiller replacement and chilled water system for a LINAC radiation therapy suite — stringent temperature and humidity requirements in an operational healthcare environment.
Full mechanical scope including rooftop units, warehouse distribution ductwork, and mezzanine mechanical systems for a 200,000+ SF pharmaceutical distribution facility.